5000hrs useful life approved for Blanik L13 modification Regaining airworthiness of Blanik L-13: STC ADxC-DC-39-001 or -004 Blaniks are/can be modified in the following countries:- Austria - Argentina - Brazil (in preparation) - Canada - Czech Republik - Germany - Iceland - Japan - Slowenia - Serbia - USA (in process @FAA since one year) A major change to the STC has been approved by EASA providing alternative limitations You can now select between: a) NO aerobatics and life extension to 5000hrs useful life (ADxC-DC-39-004) b) Aerobatics and 3750hrs useful life (ADxC-DC-39-001) For more information click here STC revision 1 for 5000hrs useful life is approved by EASA on 28-Feb-2012 (see certificate here) The STC has been approved as Method of Compliance in EASA AD 2011-0135 The STC is approved as Alternative Method of Compliance for the AD on 20-june-2011 (AMOC) STC has been approved by EASA on 14-june-2011 (see certificate here) STC for compliance with EASA-AD-2010-0185-E. Order form Eligibility: Your aircraft can be modified according this STC when it has less than 3750hrs of operational time. Aerobatic use must be below 2% or if exceeded the TC-holder (Aircraft Industries) must be consulted for corrective actions before the STC is applied. The STC is applicable also for aircraft with unknown history but known exceedance of aerobatic use may have damaged your aircraft at areas not affected by the STC and must be corrected before. Contact us for more information. The STC includes a
structural modification as well as an inspection and
replacement program. It is based on:
Modification
The modification consists of an additional root rib bracket, addition and replacement of several highly loaded rivets, and an additional girder plate attached to the spar at the lower wing root. The parts are produced by CNC milling, for optimal precision and use of material. The use of Hi-Lok fasteners ensures superior fatigue resistance and easier inspections in the affected areas.View a 3D pdf of the modification. Inspection Program The inspection program addresses the overall airplane. Specific NDT inspections are mandatory during the structural modification and in increments thereafter. The NDT inspections are made possible by definition and usage of a reference normal. A part taken from an original aircraft structure in which realistic cracks have been incorporated. With this approach AD&C was able to define a method that has a relative small undetectable crack size and helps to define the longer re-inspection intervals. Customer information The order form can be dowloaded here A FAQ and more information can be downloaded here
|
![]() |